| DESIGN |
|
|
| Definition of scope |
|
|
| Project definition |
|
|
| Establishing performance requirement |
|
|
| Preliminary survey/base map |
|
|
| Geotechnical investigation-based on preliminary design in RFP |
|
|
| Geotechnical investigation-based on proposal |
|
|
| Establish/define initial subsurface conditions |
|
|
| Initial project geotechnical analysis/report-based on preliminary design |
|
|
| Proposal-specific geotechnical analysis/report |
|
|
| Plan conformance with regulations/guidelines/RFP/proposal |
|
|
| Plan accuracy |
|
|
| Design criteria |
|
|
| Conformance to design criteria |
|
|
| Design review process |
|
|
| Owner review time |
|
|
| Design quality control |
|
|
| Design quality assurance |
|
|
| Changes in scope |
|
|
| Constructability of design |
|
|
| Efficacy of design |
|
|
| Contaminated materials |
|
|
| |
|
|
| RIGHT-OF-WAY |
|
|
| Establishing ROW limits |
|
|
| Access hearings/findings and order |
|
|
| ROW plan approval |
|
|
| Appraisal/review |
|
|
| Establish just compensation |
|
|
| Acquire right-of-way |
|
|
| Construction easements |
|
|
| Permanent easements |
|
|
| Condemnation |
|
|
| Complete relocation |
|
|
| Take possession |
|
|
| Certification |
|
|
| Additional ROW purchase due to alignment change |
|
|
| |
|
|
| ENVIRONMENTAL |
|
|
| Define initial project environmental impacts |
|
|
| Define parameters for impacts |
|
|
| Environmental investigation |
|
|
| Environmental permits |
|
|
| Environmental mitigation |
|
|
| Environmental compliance |
|
|
| Known hazardous waste-mitigation |
|
|
| Unknown/undefined hazardous waste-mitigation |
|
|
| Obtain environmental approvals-construction related |
|
|
| |
|
|
| UTILITY RELOCATION, LOCAL AGENCY PERMIT, THIRD PARTY, PUBLIC |
|
|
| Identification of initial local agency impacts |
|
|
| Obtaining initial local agency permits |
|
|
| Establishing initial local agency requirements |
|
|
| Establishing final/actual local agency impacts |
|
|
| Modifications to existing local agency permits |
|
|
| Identification of initial utility impacts from preliminary design |
|
|
| Establish initial utility locations/conditions |
|
|
| Defining required utility relocations from preliminary design |
|
|
| Relocation of utilities before contract |
|
|
| Relocation of utilities under agreement during contract |
|
|
| Modified agreement with private utility |
|
|
| Modified agreement with public utility |
|
|
| Damage to utilities under construction |
|
|
| Payment to utility owners |
|
|
| Verification of utility locations/conditions |
|
|
| Coordination with utility relocation efforts during contract |
|
|
| Unforeseen delays due to utility owner and third party |
|
|
| Utility/third-party delays resulting from proposal/modified design |
|
|
| Betterment to utility |
|
|
| Other work/coordination |
|
|
| Third-party agreements (Federal, local, private, etc.) |
|
|
| Coordinating with third parties under agreement |
|
|
| Coordination/collection for third-party betterments |
|
|
| Coordination with other projects |
|
|
| Coordination with adjacent property owners |
|
|
| Performance of utility work |
|
|
| Coordinating with other government agencies (FHWA, etc.) |
|
|
| Community relations |
|
|
| Public safety |
|
|
| |
|
|
| CONSTRUCTION |
|
|
| Disadvantaged business enterprise compliance |
|
|
| Safety/safety QA |
|
|
| Construction quality/workmanship |
|
|
| Schedule |
|
|
| Materials quality |
|
|
| Materials documentation |
|
|
| Material availability |
|
|
| Initial performance requirements of QA plan |
|
|
| Final construction/materials QC/QA plan |
|
|
| Construction/materials QA |
|
|
| Construction QC |
|
|
| Construction QA procedural compliance auditing |
|
|
| Construction independent assurance (IA) testing/inspection |
|
|
| Construction staking |
|
|
| Erosion control |
|
|
| Spill prevention |
|
|
| Accidents within work zone/liability |
|
|
| Third-party damages |
|
|
| Operations and maintenance during construction |
|
|
| Maintenance under construction-new features |
|
|
| Maintenance under construction-existing features |
|
|
| Extraordinary maintenance |
|
|
| Maintenance of traffic |
|
|
| Damage to utilities under construction |
|
|
| Falsework |
|
|
| Shop drawings |
|
|
| Equipment failure/breakdown |
|
|
| Work methods |
|
|
| Early construction/at-risk construction |
|
|
| Community relations |
|
|
| Performance of defined mitigation measures |
|
|
| Warranty |
|
|
| |
|
|
| FORCE MAJEURE/ACTS OF GOD |
|
|
| Strikes/labor disputes-onsite labor |
|
|
| Ordinary weather condition |
|
|
| Extraordinary weather condition |
|
|
| Tornado/earthquake |
|
|
| Epidemic, terrorism, rebellion, war, riot, sabotage |
|
|
| Archaeological, paleontological discovery |
|
|
| Suspension of any environmental approval |
|
|
| Changes in law |
|
|
| Lawsuit against project |
|
|
| Storm/flooding |
|
|
| Fire or other physical damage |
|
|
| |
|
|
| DIFFERING SITE CONDITIONS/CHANGED CONDITIONS |
|
|
| Changed conditions |
|
|
| Differing site conditions |
|
|
| |
|
|
| COMPLETION AND WARRANTY |
|
|
| Establishment/definition of any risk pool |
|
|
| Long-term ownership/final responsibility |
|
|
| Insurance |
|
|