Risk Assessment and Allocation for Highway Construction Management

Risk Management Matrix - High Probability, High Impact

Return to Text

bar graph

Figure 20. This Bar graph is a rough right-skewed bell curve showing Distribution for Total Project Costs in Current Dollars. The mean is 18.5, with a 90 percent probability range from 16.1 to 21.2, and a 5 percent probability above or below that range.