Skip to contentUnited States Department of Transportation - Federal Highway Administration

International

 

Risk Assessment and Allocation for Highway Construction Management

Risk Management Matrix - High Probability, High Impact

Return to Text

graphs

Figure 18. Graphs showing typical Monte Carlo output for total costs. Bar graph at left appears generally bell-shaped and shows Distribution for Total Projects Costs in Current Dollars. The Mean is 499.57, with a 90 percent probability range from 437.98 to 566.93, and a 5 percent probability above or below the range. Line Graph at right shows Cumulative Total Project Costs in Current Dollars. The diagonal curve gently levels out below the 400 and above the 600 range. The Mean is 499.57, with a 90 percent probability range from 437.98 to 566.93, and a 5 percent probability above or below the range.

Return to Text

Events

More Information

Contact

Hana Maier
Office of International Programs
202-366-6003
hana.maier@dot.gov

 
 
This page last modified on 11/15/07
 

FHWA
United States Department of Transportation - Federal Highway Administration