Risk Assessment and Allocation for Highway Construction Management

Risk Management Matrix - High Probability, High Impact

Return to Text

Figure 13: Cost risk assessment top-level diagram

Figure 13. Cost Risk Assessment top-level diagram. At the top is Cost Risk Baseline. In the center are the following steps:

  • Identify Key Performance and schedule risks
  • Select cost analysis level of detail
  • Construct Work Breakdown Structure-level probability distribution
  • Analyze Monte Carlo simulation results

Input on the left side of the diagram includes

  • Performance Risks (Includes Technical Risk)
  • Schedule Risks
  • Cost Risk

Output on the right side includes

  • Estimate at Completion
  • Cost Risk
  • Cost Driver/Risk Identification Sheets
  • Cost Estimate Probability Density Function

On the bottom of the diagram is

  • Cost Estimating Team
  • Cost Risk
  • Work Breakdown Structure Managers
  • Cost Estimate Probability Density Function

Cost risk assessment top-level diagram (adapted from Project Management Practices: Risk Management, DOE 2003).

Return to Text

Events

More Information

Contact

Hana Maier
Office of International Programs
202-366-6003
hana.maier@dot.gov

 
 
This page last modified on 11/15/07
 

FHWA
United States Department of Transportation - Federal Highway Administration